About
Contact
Audit Survey
Services
Local Law 87
Local Law 84
Building Commissioning
Energy Modeling
MEP Design
PCA
(Property Conditions Assessments)
ESA
( Environmental Site Assessments)
Additional Services
Schedule a Free Consultation
Resources
LL87 Compliance
LL87 Compliance Steps
Energy Benchmarking
(LL84/LL33)
Local Law 97
Local Law 33
ASHRAE Audit Level III Components
LL87 Documents
LL84 Documents
Marketing Materials
Recent Projects
Local Law 87 Projects
PCA
(Property Condition Assessments)
Engineering Projects
ABOUT
SERVICES
SERVICES
Local Law 87
Local Law 84
Building Commissioning
Energy Modeling
MEP Design
PCA
(Property Conditions Assessments)
ESA
(Environmental Site Assessments)
Additional Services
Schedule a Free Consultation
RECENT PROJECTS
Local Law 87 Projects
PCA
(Property Condition Assessments)
Engineering Projects
RESOURCES
RESOURCES
LL87 Compliance
LL87 Compliance Steps
Energy Benchmarking
(LL84/LL33)
Local Law 97
Local Law 33
ASHRAE Audit Level III Components
LL87 Documents
LL84 Documents
Marketing Materials
CONTACT
AUDIT SURVEY
Audit Survey
Building Address
(Please also list any alternative addresses used)
*
Name of on-site engineer or other staff responsible for repairs and maintaining equipment? Phone number for this staff?
*
The DOB will ask us these questions on every submission:
1. Building Owner?
*
2. Does your property have a Building Operations Protocol in place?
*
3. Does your building super or management representatives have an operator’s certificate or other energy efficiency training?
*
Please list any planned or desired building improvements
*
Do the tenants own or maintain the HVAC equipment themselves? If so list the equipment and equipment location.
Do the tenants own or maintain the HVAC equipment themselves? If so list the equipment and equipment location.
How many elevators are on the premises?
Approximately how many motors
(fans & pumps)
does your building have that are 10 HP or more?
How is the HVAC system controlled?
(BMS, EMS, Heat Timer, Pressuretrols, Thermostats direct to units, etc)
How is the building heated? (Hot Water Boiler, Steam Boiler, Roof top units, Heat Pumps, VRF)
-- Approx. # of Steam Traps? –
For if boilers for heating - how many boilers do you have?
For Domestic Hot Water Heating, how many boilers do you have? What is the configuration if otherwise?
How is the building cooled?
(Chiller, Roof top unit, PTAC/Window Units, Split Systems)
How is the building ventilated?
(Exhaust Fans, Make up Air Unit, Windows)
Has a combustion analysis been performed within the last 12 months? Do you have the combustion printouts?
Please list the supply companies used for Gas and Electric
Does the building use oil?
Preferred days/times for a site visit.
submit